external suction system with filter, motor, collection silos and various connection pipes also inside the building - ref. 104
- Following the dismantling of the system, it will be the contractor's responsibility to close the openings on the facade/roof of the building. The disposal of any material contained in the above assets will be the responsibility of the contractor -
Server time Sun 14/06/2026 at 20:09 | Europe/Rome
Español
Italiano
English
Français
Euskara
Català
Deutsch
Nederlands
Português
Shqiptare
Български
Čeština
Ελληνικά
Hrvatski
Magyar
Македонски
Polski
Română
Српски
Slovenský
Slovenščina
Türkçe
Русский
Dansk
Suomalainen
Íslenskur
Norsk
Svenska
