Painting and varnishing booth
*Collection of this lot*
The award and collection of this lot is subject to the strict and unavoidable obligation on the part of the successful bidder to restore the warehouse to its original condition. Whoever is awarded this lot assumes all costs and must carry out, simultaneously with the dismantling, the following works:
-
Roof enclosure: Seal and fully waterproof the three (3) roof openings used by the booth chimneys.
-
Comprehensive floor repair: Fill the absorption pit, pour a layer of reinforced concrete with industrial strength, and apply a surface finish of quartz-corundum, leaving it perfectly level and identical to the rest of the warehouse flooring.
Legal notice: The removal of the booth components will not be permitted without the proper execution of these restoration works. Non-compliance will result in the loss of rights over the lot in favor of the property owner, with no right to a refund of the amount paid.
For more information, please consult the lot attachment.
Español
Italiano
English
Français
Euskara
Català
Deutsch
Nederlands
Português
Shqiptare
Български
Čeština
Ελληνικά
Hrvatski
Magyar
Македонски
Polski
Română
Српски
Slovenský
Slovenščina
Türkçe
Русский
Dansk
Suomalainen
Íslenskur
Norsk
Svenska