combination of plant, machinery, equipment and vehicles
the bidder must arrange, at his sole responsibility, for the disposal of all the goods constituting the two lots purchased and not taken from
For lots located in Orbassano (lots from 1 to 60), the bidder must arrange, at his sole responsibility, to dismantle and remove the constituent goods within 240 days from the completion of the transfer, with a penalty of € 30.500,00 for each month or fraction of month of delay
For lots located in Milan (lots from 61 to 107), the bidder must provide, at his sole responsibility, for the dismantling and removal of the constituent goods within 150 days from the completion of the assignment, with a penalty of € 16.000,00 for each month or fraction of month of delay
Palvelimen aika Fri 31/10/2025 tunnit 17:07 | Europe/Rome
 Español
   Español Italiano
   Italiano English
   English Français
   Français Euskara
   Euskara Català
   Català Deutsch
   Deutsch Nederlands
   Nederlands Português
   Português Shqiptare
   Shqiptare Български
   Български Čeština
   Čeština Ελληνικά
   Ελληνικά Hrvatski
   Hrvatski Magyar
   Magyar Македонски
   Македонски Polski
   Polski Română
   Română Српски
   Српски Slovenský
   Slovenský Slovenščina
   Slovenščina Türkçe
   Türkçe Русский
   Русский Dansk
   Dansk Suomalainen
   Suomalainen Íslenskur
   Íslenskur Norsk
   Norsk Svenska
   Svenska






