33875: Auto e Moto - Liquidazione Giudiziale n. 30/2026 - Tribunale de Fermo

SPECIFIC TERMS AND CONDITIONS

By submitting a bid, the bidder declares to have fully reviewed and to fully accept these conditions of sale and all documentation made available. If a sale notice is attached to the auction listing/announcement, by placing a bid, the bidder declares to have reviewed and to accept the conditions set forth therein, with respect to which these conditions of sale are to be understood as an extract. The bidder further declares to have examined and accepted all documentation made available for participation purposes

The cover image has been digitally processed for purely illustrative purposes to represent the model and characteristics of the vehicle. The actual condition may differ and, therefore, you are invited to review all photos in the auction listing 


Auction duration:

Start: mer 11/11/2026 ore 16:00
End: ven 11/12/2026 ore 16:00

Viewing conditions:

Visiting dates:

for visit booking and further details: [email protected] – tel +39.02.86882269

Deposit

The auction is subject to a security deposit of EUR 500,00.

Lot 0 requires the payment of a deposit equal to EUR 6.500,00

Lots with a starting value equal to or greater than EUR 5,000.00 require the payment of a specific security deposit indicated in the relevant lot sheets.

The deposit must be paid via:

1) online credit card

or

2) bank transfer to the following current account:

MONTE PASCHI DI SIENA SPA
Fabriano Branch
 
IBAN : IT 43 K 01030 21100 000000414486
Swift/BIC: PASCITM1K07

in the name of GOBID INTERNATIONAL AUCTION GROUP S.R.L.

The deposit must be mandatory credited before the auction end.
Once the deposit is credited, the user will be enabled to participate in the auction.
To speed up participation in the auction, the user  is advised to send a scanned accounting copy of the payment made with the CRO code to: [email protected]

If auction participants do not win any goods, the deposit will be returned within 20 working days from the final auction end date, without interest.

If, in the event of a successful bid, after paying the deposit, the bidder does not complete the purchase, said deposit will be retained.

Availability of Lots

Any registrations relating to rights of first refusal, transcriptions of foreclosures and conservatory seizures and any other restriction burdening the goods put up for sale, will be cancelled pursuant to art. 217, paragraph 2° C.C.I.I. once the sale is executed and the price is fully collected. Any formality for cancellation will be carried out at the expense of the successful bidder.

Any costs relating to transfers of ownership, including any double transfers and related charges, will be borne by the successful bidder

In case of export of registered movable assets, the buyer must carry out the required operations in compliance with current regulations. Please note that for the purposes of deregistration for export, on the date of the request, the vehicles must be in compliance with the periodic inspection obligations required by law.

Payment method

All payments must be made exclusively by bank transfer. The details will be specified either at the time of registration or upon receipt by the user of the award communication (see general conditions).

Payment deadline

Awarded lots must be paid within 5 days from the provisional award confirmation.
The Buyer's Premium and ancillary management charges, where applicable, must be paid within 5 days from the provisional award confirmation.
(see general auction conditions)


Collection of awarded lots
 
The collection of awarded lots by the buyer may take place only after actual receipt of payments of the award price and the fees provided (Buyer’s Premium, ancillary management charges).


 After the term of 10 days from the award , for each day of delay in the collection date, the Procedure will charge a penalty of Euro 100.00 per single lot to be paid before collection.

In the event that the goods are not collected within 10 days from the award, the goods will be removed from the company premises, if necessary dismantled, and transported to a warehouse; the costs incurred for dismantling, transport and storage will be charged to the successful bidder.

In the event that the goods are not collected by the final collection deadline (40 days from the award), the sale shall be automatically terminated and the amounts paid by the successful bidder, both as price and Buyer’s Premium, will be retained as a compensatory penalty, without prejudice to the Procedure's right to compensation for greater damage..


If the sale concerns registered vehicles, they will be made available for collection once the transfer of ownership is completed; for this purpose the Receiver will indicate the competent Agency to carry out the transfer of ownership of the cars. The successful bidder shall be required to act promptly to complete the necessary paperwork for the transfer of ownership, without prejudice to the right of the Procedure Bodies to declare the forfeiture of the award in case of persistent non-performance by the same. All expenses and ancillary charges related to the award, including expenses relating to the transfer of ownership, are borne by the successful bidder/buyer.

Following completion of the transfer of ownership, any expense, tax or administrative, as well as any charge and liability attributable to the vehicle will be placed exclusively and entirely at the expense of the successful bidder.

Once the transfer of ownership is completed, the successful bidder must collect the goods no later than 5 (five) days from the communication of availability.

In case of failure to collect within the aforementioned term, the registered vehicle will be removed from the company premises and transported to a warehouse; the costs incurred for transport and storage will be charged to the successful bidder, in addition to a penalty of € 100.00 (one hundred/00) for each day of delay, to be paid before collection of the vehicle, without prejudice and unimpaired the right of the procedure to act for compensation for greater damage.


The collection of goods awarded at auction must be carried out at the care and expense of the successful bidder who is required to leave the places where the goods are located in safe conditions and free from things and waste materials resulting from the collection.

Please note that, with the exception of registered movable assets, in order to proceed with the collection of goods awarded for which dismantling and handling are necessary, the person in charge of such activities — whether the successful bidder or a third-party company with appropriate delegation — must be equipped with adequate and suitable RCT insurance coverage, to guarantee and cover any damage caused during operations to the goods, movable or immovable, present there. In its absence, dismantling and handling will not be permitted.



In order to optimize the collection service, GOBID INTERNATIONAL AUCTION GROUP SRL will notify successful bidders by e-mail of the date(s) and a time during which they may proceed with collection of the lots.  Such dates may also be indicated on the auction web page. GOBID INTERNATIONAL AUCTION GROUP SRL in any case reserves the right to modify the collection dates and times indicated at its sole discretion.
 
If the successful bidder should collect on dates other than those communicated, it must pay a fee of between EUR 250.00 and EUR 350.00 plus VAT  per day, depending on the quantity of goods to be collected, as additional charges.
 
Successful bidders shall be required to comply with the start date of operations. If the successful bidder cannot collect on the communicated day and time, it may:
 
-  subject to approval, collect on days and times other than those made available for the individual auction, paying an additional fee of between EUR 250.00 and EUR 350.00 plus VAT per day, depending on the quantity of goods to be collected, as additional charges
 
Failure to comply with the  scheduled collection date between GOBID INTERNATIONAL AUCTION GROUP SRL and the successful bidder shall result in the application to the latter of a penalty of EUR 350.00 if the failure to collect is not notified at least 48 hours before the appointment, without prejudice, in any case, to compensation for the greater damage suffered by GOBID INTERNATIONAL AUCTION GROUP SRL.
 
GOBID INTERNATIONAL AUCTION GROUP SRL is not required to deliver any lot nor to organize in any way their collection. 
 
Collection operations must be carried out by the buyer in compliance with the applicable safety regulations established by law; the buyer shall therefore be required to make the necessary adjustments in this regard also with reference to any third parties and/or collaborators employed in carrying out the aforementioned operations.
 
The buyer is responsible for any dismantling, handling, loading and transport of the awarded lots and is required to leave the places involved in the collection in safe conditions and free of goods and/or waste materials produced by it during the aforementioned operations. In the case of registered movable property, the buyer shall be deemed responsible for handling the procedures required to carry out the necessary transfers of ownership. 
 
Transfers of ownership must therefore be carried out at the expense of the successful bidder at the vehicle registration agency communicated by the Procedure Bodies, or alternatively, communicated by GOBID INTERNATIONAL AUCTION GROUP SRL.
 
In the event of export of registered movable property, the buyer must carry out the required operations in compliance with applicable regulations.
 
In any case, GOBID INTERNATIONAL AUCTION GROUP SRL will not make any lot available before the aforementioned payments have been credited and, in the case of registered movable property, before completion of the relevant transfer of ownership.



Other specific conditions

Buyer's Premium
: A charge of 12,00% + VAT will be added to the hammer price of each lot.

The Buyer’s Premium will have a minimum amount of €25 (+ 22% VAT where applicable), on each of the awarded lots or combinations, as minimum fees.

Additional management charges: These are ancillary costs entirely borne by the winning bidder, intended to cover the services and activities, performed and to be performed, necessary for the preparation, organisation and management of the sale of the auction goods and the subsequent award phase. Such expenses must be paid at the same time as the payment of the buyer's premium due as per the provisional award confirmation that will be issued after the end of the auction. Where due, such charges will be indicated in the details of each lot.

VAT: VAT at 22,00% of the sale price will be calculated on the hammer price of each lot. (where applicable)

Extra-Time: if a winning bid is placed in the 5 minutes before the close of the auction, the time available to place another bid will be extended by a further 5 minutes from the last bid received. And so on, for each winning bid received within the 5 minutes of extra time, the time available to place another bid will be extended by a further 5 minutes from the last bid received.  Automatic outbids in the case of a maximum bid (proxy bid) will also be considered winning bids.

Bids on the Complete Lot: If no bids are received on the complete lot (Lot 0), the individual lots and/or combinations will be awarded.
If bids are received on the complete lot (Lot 0), at the end of the auction the bodies of the Procedure reserve the right to award or not award this lot based on the values reached by the individual lots.

The lots are sold as seen and liked in the condition in which they are. Viewing is recommended.

The sale of the goods is intended as forced (Art. 2919 Italian Civil Code) and is arranged for the goods as seen and liked in the factual and legal condition in which they are. In a forced sale, the warranty for defects of the item does not apply. It cannot be challenged on grounds of damage. (Art. 2922 Italian Civil Code).

Consequently, the existence of any defects or lack of quality or non-conformity of the item sold cannot give rise to compensation, indemnity or price reduction.

Any liability on the part of the Agent regarding the existence of third-party rights over the goods subject to the sale is excluded (Art. 2920 Italian Civil Code).

The sale takes place with the obligation and burden on the winning bidder to verify their compliance with safety regulations.

In the event of any disputes arising relating to the interpretation of the provisions contained in the general and specific conditions set out on the platform, possibly translated into other languages, the Italian version of the text shall prevail.
Gobid.it

Gobid.it è na marca registrata da: GOBID INTERNATIONAL AUCTION GROUP SRL

Sede Centrale: Via P.O.Vigliani, 19 - 20148 Milano (MI)

Sede Operativa: Via Merloni, 17/U - 62024 Matelica (MC)

tel: 0039.02.86882269 - fax: 0039.0737.786198 - email: [email protected]